Toronto Transit Commission:
H.J. Skelton is pleased to announce the sale of three Abtus ABT4650 RouteScan Clearance Gauges to the Toronto Transit Commission. For more information on our Abtus products please contact H.J. Skelton at skelton@skelton-metals.com.
______________________
Edmonton North LRT Project:
Skelton has been awarded the contract to supply materials for their Kingsway crossing rebuild. This award comprises the supply of the extra special; track guardrail, mounting brackets, rubber membranes, in-street ties, rubber rail boot, flange filler and Icosit elastomeric load bearing grout.
Our expertise consisted of combining the talents and materials of three suppliers on two continents. Skelton has the international connections stretching back 128 years.
When it comes to railway track materials you will never do better than procuring from H.J. Skelton.
______________________
We have also completed the supply and assistance for the installation of the Moklansarail lubrication system in Edmonton. It is a green system and was mounted on a track inside a tunnel ahead of the curve. It was built to withstand minus FORTY degree temperatures!
The suppression of rail squeal was the first criteria due to the incessant complaints from residents. It also reduces rail and wheel wear. If local residents threaten court action because of intolerable track noises, please contact us.